Home ProductsChoke Kill Manifold

1 Inch Hydraulic Choke Kill Manifold High Pressure With Choke Valves

Certification
China Hebei E-valves Petroleum Equipment Co., Ltd. certification
China Hebei E-valves Petroleum Equipment Co., Ltd. certification
I'm Online Chat Now

1 Inch Hydraulic Choke Kill Manifold High Pressure With Choke Valves

1 Inch Hydraulic Choke Kill Manifold High Pressure With Choke Valves
1 Inch Hydraulic Choke Kill Manifold High Pressure With Choke Valves 1 Inch Hydraulic Choke Kill Manifold High Pressure With Choke Valves

Large Image :  1 Inch Hydraulic Choke Kill Manifold High Pressure With Choke Valves

Product Details:
Place of Origin: China
Brand Name: Hebei Pantu
Certification: API 16C
Model Number: YG105
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD 50000-100000 per set
Packaging Details: Iron Case
Delivery Time: 7 work days
Payment Terms: T/T
Supply Ability: 5 sets per 3 months

1 Inch Hydraulic Choke Kill Manifold High Pressure With Choke Valves

Description
Name: Choke Kill Manifold High Pressure Model: YG105
Bore Size: 2 1/16 Inch Pressure: 15000psi
Feature: High Pressure Standard: API 16C
Highlight:

Hydraulic Choke Kill Manifold

,

High Pressure Choke Kill Manifold

,

High Pressure Hydraulic Choke Manifold

2 1/16 Inch 15000psi Choke Kill Manifold High Pressure

 

When drilling the well, the Choke Kill Manifold were connected to either side of the BOP; the Choke Kill Manifold can accomplish the choke circulation and bleed by opening and closing the gate valve of the manifold or adjusting the choke valve. It also can adjust the pressure between the bit pressure and the casing. They are the tools used for balance-drilling or unbalanced-drilling. If the well blowout or kicks in the drilling process, bleed and reduce the pressure by opening the choke manifold in the sideway or the gate valve in the middle. Mud with high pressure from the well pump can control the blowout and kick when it goes into the casing through the kill manifold

 

Parameter of Choke Kill Manifold

 

Type Working pressure Main bore dia By-pass dia. Remarks
(psi) On.) (In.)
YG140 20000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 1/16" 2 9/16" Different types of combinations can be provided according to requirements
YG105 15000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 9/16" 2 1/16"
YG70 10000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 4 1/16" 3 1/16" 2 9/16" 2 1/16"
YG35 5000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"
YG21 3000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"

 

Configuration


The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges, and other components.

 

Operating Instructions


(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the operator can reach it easily. The pressure test must be performed before installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120-degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low-temperature conditions.

 

Contact Details
Hebei E-valves Petroleum Equipment Co., Ltd.

Contact Person: Peter

Tel: +86 19333067506

Send your inquiry directly to us (0 / 3000)