Home ProductsChoke Kill Manifold

API 16C Standard Choke Kill Manifold Drilling Control Equipment 3000psi

Certification
China Hebei E-valves Petroleum Equipment Co., Ltd. certification
China Hebei E-valves Petroleum Equipment Co., Ltd. certification
I'm Online Chat Now

API 16C Standard Choke Kill Manifold Drilling Control Equipment 3000psi

API 16C Standard Choke Kill Manifold Drilling Control Equipment 3000psi
API 16C Standard Choke Kill Manifold Drilling Control Equipment 3000psi API 16C Standard Choke Kill Manifold Drilling Control Equipment 3000psi

Large Image :  API 16C Standard Choke Kill Manifold Drilling Control Equipment 3000psi

Product Details:
Place of Origin: China
Brand Name: Hebei Pantu
Certification: API 16C
Model Number: YG21
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD 50000-100000 per set
Packaging Details: Iron Case
Delivery Time: 7 work days
Payment Terms: T/T
Supply Ability: 5 sets per 3 months

API 16C Standard Choke Kill Manifold Drilling Control Equipment 3000psi

Description
Name: Choke & Kill Manifold Model: YG21
Bore Size: 2 9/16 Inch Pressure: 3000psi
Application: Drilling Control Equipment Standard: API 16C
Highlight:

API 16C Standard Choke Kill Manifold

,

Drilling Control Choke Kill Manifold

,

API 16C Drilling Control Equipment

API 16C Standard Choke & Kill Manifold Drilling Control Equipment

 

The choke and kill manifold were attached to both sides of the BOP during the well drilling process; the choke circulation and bleed can be achieved by varying the choke valve or the manifold's gate valve. The pressure differential between the bit pressure and the case can also be adjusted. These are the instruments used for either unbalanced or balanced drilling. In the event of a well blowout or kick during drilling, open the gate valve in the middle or the choke manifold in sideways to release pressure. When mud enters the casing through the kill manifold, the well pump's high pressure can regulate the blowout and kick.

 

Choke & Kill Manifold Parameter

 

Type Working pressure Main bore dia By-pass dia. Remarks
(psi) On.) (In.)
YG140 20000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 1/16" 2 9/16" Different types of combinations can be provided according to requirements
YG105 15000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 9/16" 2 1/16"
YG70 10000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 4 1/16" 3 1/16" 2 9/16" 2 1/16"
YG35 5000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"
YG21 3000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"

 

Configuration


The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges, and other components.

 

Operating Instructions


(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the operator can reach it easily. The pressure test must be performed before installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120-degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low-temperature conditions.

 

Contact Details
Hebei E-valves Petroleum Equipment Co., Ltd.

Contact Person: Peter

Tel: +86 19333067506

Send your inquiry directly to us (0 / 3000)